Car wash
This Dutch car wash has several wash boxes in which people can wash their car themselves and one 33m long automatic car wash. The hot water demand of this car wash is a total estimate of 2160 liter/ 50°C per…
Educational sports facility
Designed by Will Alsop, the new 4,000 sq m Carnegie Pavilion in Leeds, Yorkshire, is a multi-purpose building that operates as a university teaching facility during the academic year and as a cricket pavilion and media centre during the summer….
High School
The new Woodchurch High School in Wirral is a school with over 1300 pupils. The school houses a farm and library. The building has specialist rooms which have been refurbished to ensure a high standard of facilities. The school is…
Indoor Athletics Centre
Built adjacent to an existing public sports centre plus outdoor track and field facilities, this building is used by local schools in the daytime and the public in the evenings. It is hoped that these facilities will also contribute to…
Dairy farm
This dairy farm has 2 milking robots and a 12,000 litre milk tank. Over at this location a BFC Cyclone with a plate heat exchanger were installed. The hot water is used to clean the robots and the milk tank.
Mini camp site
At this recently opened mini camp site an SGE with 5 collectors and a plate heat exchanger were installed. The SGE gas-solar water heater supplies the 8 showers and wash basins in the bathroom with hot water. The plate heat exchanger…
Council offices
The Stockport Metropolitan Borough Council (MBC) provides services to many thousands of people. The borough stretches from the borders of the Peak District National Park to Manchester. The existing Ponsonby Building next to the Stockport Town Hall was refurbished so…
Nursing home
Birchwood, a newly built nursing home in Warrington, Cheshire, has been equipped with the ITS indirect solar system from A.O. Smith. Good experience with A.O. Smith water heaters in the past combined with local building regulation made them decide, in…
Residential buildings
The ITS is fitted with 2 coils. In the solar alignment the upper coil is connected to a water heater or boiler. This water heater or boiler provides the pre- or after heating if the solar contribution is not sufficient….
Sheltered accomodation
This sheltered accommodation site in East London has 79 warden controlled flats. A.O. Smith has supplied an integrated solar system, consisting of 2 SGE water heaters and 8 solar collectors. The SGE is a high efficiency gas-solar water heater. In…
